Scope of supply
− Project management
− Engineering
− Preparatory works, HDD and sea trenches at shorelandings
− Cable laying and installation including ROV TDM
(two campaigns @ 2400 m)
− Shorelanding and floating operations, aprox 4 x 500 m
Specific challenges
Installation in Central Stockholm, Lake Mälaren.
Shallow water installation.
Cable type
Cable type: HVAC 145 kV
Total cable length: 2 x 2,4 km
Campaigns: 2
Customer: Craftor AB (Responsible for cable supply/jointing)
Final Client: Vattenfall